My trials and tribulations

Hi all ,this blog is going to show some of the tricks in my life ,Enjoy !

Friday 4 July 2014

Rotating tube clamp

 Boss had to be turned then welded to tube.Tightly sleeves over the landrover UJ and welded.I also drilled a hole in bottom of UJ to let the water out ,any trapped water in the winter can do some serious damage when frozen.

After Welding 






Studs welded to take up slack on  rotating pole.Inside the tube is 68mm,pipe will be 65mm ,so a little play .
 
    Bottom is drilled to put a drive dowel through the pole.Bit of cold galv and i recon the top is done .

What's left to do know is mount the rotary encoder on the base of output shaft ...and i'm good to go !!!

No comments:

Post a Comment