No before and after pics ,just in the middle of .
The end of top section was rotten ,mainly due to wood being put into the hollow round section to stop water ingress ,unfortunately this made it worse by actually harbouring the water causing it to rot.
So new pipe spliced into the old and made a foot (300mm) longer ...lol i just cant help it !!
New pole mounts made .The rotator cage taken off as this is just to hold the 120m doublet up in the air
Trial fitting of fabricated wall mount(pre paint) .20mm through bolts hold it in place .Walls are 2 feet thick (600mm)
First lower section trial fit ...looking good !!,Its a little lower than current scaffold mast which is 45-50ft ,im hoping for around 70 ft with this tower arrangement